All pages
Powered by GitBook
1 of 3

Loading...

Loading...

Loading...

Project - Rebase and Promotion

How do I... ?

Provide Feedback

Rebase a project (synchronize content changes from other projects)

Steps
References

Rebase eligibility is indicated as an active (yellow) Pull in Mainline Changes icon button in the project actions button bar in the upper right corner of the Project View.

Press Pull in Mainline Changes to initiate the rebase process.

The main display panel changes to show a blue "Comparing project to mainline content, please wait just a moment..." full display panel notice (with an animated timer indication that the comparison process is taking place).

If the rebase comparison shows that merging can be completed with no content conflicts, the main display panel changes to show a green "Project can be merged with mainline content without issues, pulling changes in from mainline content..." full display panel notice (with an animated timer indication that the merge process is taking place).

Once the merges are completed, the main display panel changes to show a green a green "Success! Switching to project view in five seconds..." full display panel notice, which closes automatically after five seconds have elapsed (during which the merges are finalized in the project branch content).

The Project View is reloaded, with the Pull in Mainline Changes (rebase project) button now inactive (greyed out).

At this point the project branch status has been returned to Forward, and changes made within the project are once again eligible for promotion to the mainline.

Project rebase issues

Project merges generally complete without issues, however some conditions such as a component integrity issue may occur, for instance where a dependent concept is missing or inactivated unintentionally.

These situations may trigger a red alert box overlay in the page header with an indication that technical support should be sought to resolve the problem. The message below shows an example of a missing or inactive referenced concept in an axiom triggering a rebase problem:

If the terminology server encounters such an issue when trying to merge project and mainline content, it may roll back changes to restore the pre-rebase branch states to avoid leaving them in an unusable condition. As the message states, please contact technical support if such an alert occurs.

Provide Feedback
Rebase a project (synchronize content changes from other projects)
Promote a project (promote to MAIN)

Promote a project (promote to MAIN)

Steps
References

Project-level SAC are presented in the Project View as two lists within the Acceptance Criteria accordion-style expandable/collapsible content section, located below the Project Details and above the Classification Results section.

Automated Project-level SAC are listed to the left, with Manual Project-level SAC to the right.

Automated SAC have a yellow warning triangle icon if not yet met, and a green tick if their automated system checks confirm they are satisfied.

Manual SAC are presented initially as open checkboxes, each of which can be interactively signed-off (green-ticked) when the user's role-based access permissions match those configured for that SAC control.

For many projects it may be appropriate to only enable Manual SAC. In this case the Automated Criteria heading is still present, but that list is empty, and the project may then be promoted when all Manual SAC are signed-off.

Particular manual SAC require a specific role to be able to sign-off, such as PROJECT_LEAD, so more than one person may be needed to get all SAC satisfied, and those without a required role will see the current status of those SAC, but will not be able to change it.

When all mandatory project-level SAC are satisfied, the project is not diverged, and the project configuration enables promotion, the Promote button will be active for those with the PROJECT_LEAD role.

Press Promote to promote the project contents to the mainline branch.

A "Preparing for project promotion..." notification is presented in the page header.

On completion of the promotion process, a "Project successfully promoted for " notification is presented in the page header, and the Project-level SAC are reset (if so configured in their definition - see the info panel), ready for the next cycle of project content updates.

SAC Definitions and Acceptance Roles

With more frequent delivery of SNOMED CT releases, project-level SAC are an essential aspect of the International Edition content quality control process. However, it is technically feasible for projects not to have project-level SAC defined, and some may have Manual SAC but no Automated SAC or vice versa.

Project-level (and task-level) SAC definitions can be set by those who have the PROJECT_MANAGER role, usually in close consultation with those in the PROJECT_LEAD and RELEASE_LEAD roles.Individual user accounts may also be granted more than one access control role (via membership of the appropriate access control groups).

SAC Definitions and Acceptance Roles

Usual configuration practice is to set Project-level SAC to automatically reset to the "unsatisfied" state when project content is promoted to the parent mainline branch. This is in anticipation of subsequent, often repeated, project content updates from its authoring tasks, within each mainline release version authoring cycle. Such resetting ensures that these checks are re-confirmed before promoting project content, and hence reduces the risk of unexpected content changes reaching the project mainline.

However, since this is a configuration option, there may be scenarios in which the "satisfied" status is maintained across project promotions once it has been set. Such authoring process decisions are the remit of those with the PROJECT_MANAGER and/or PROJECT_LEAD role(s) to identify and confirm for the relevant content releases.

Provide Feedback