Rebase eligibility is indicated as an active (yellow) Pull in Mainline Changes icon button in the project actions button bar in the upper right corner of the Project View.
Press Pull in Mainline Changes to initiate the rebase process.
The main display panel changes to show a blue "Comparing project to mainline content, please wait just a moment..." full display panel notice (with an animated timer indication that the comparison process is taking place).
If the rebase comparison shows that merging can be completed with no content conflicts, the main display panel changes to show a green "Project can be merged with mainline content without issues, pulling changes in from mainline content..." full display panel notice (with an animated timer indication that the merge process is taking place).
Once the merges are completed, the main display panel changes to show a green a green "Success! Switching to project view in five seconds..." full display panel notice, which closes automatically after five seconds have elapsed (during which the merges are finalized in the project branch content).
The Project View is reloaded, with the Pull in Mainline Changes (rebase project) button now inactive (greyed out).
At this point the project branch status has been returned to Forward, and changes made within the project are once again eligible for promotion to the mainline.







Project-level SAC are presented in the Project View as two lists within the Acceptance Criteria accordion-style expandable/collapsible content section, located below the Project Details and above the Classification Results section.
Automated Project-level SAC are listed to the left, with Manual Project-level SAC to the right.
Automated SAC have a yellow warning triangle icon if not yet met, and a green tick if their automated system checks confirm they are satisfied.
Manual SAC are presented initially as open checkboxes, each of which can be interactively signed-off (green-ticked) when the user's role-based access permissions match those configured for that SAC control.
For many projects it may be appropriate to only enable Manual SAC. In this case the Automated Criteria heading is still present, but that list is empty, and the project may then be promoted when all Manual SAC are signed-off.
Particular manual SAC require a specific role to be able to sign-off, such as PROJECT_LEAD, so more than one person may be needed to get all SAC satisfied, and those without a required role will see the current status of those SAC, but will not be able to change it.
When all mandatory project-level SAC are satisfied, the project is not diverged, and the project configuration enables promotion, the Promote button will be active for those with the PROJECT_LEAD role.
Press Promote to promote the project contents to the mainline branch.
A "Preparing for project promotion..." notification is presented in the page header.
On completion of the promotion process, a "Project successfully promoted for " notification is presented in the page header, and the Project-level SAC are reset (if so configured in their definition - see the info panel), ready for the next cycle of project content updates.



